PrintCopy.info service

OKI C3530

Troubleshooting. LCD Display Malfunction

Nothing is displayed in LCD

Confirmation Items Confirmation Tasks Action at NG
Fuse confirmation
F4 (fuse) of main board (M32 PCB) Confirm whether F4 is cut. Exchange F4 or M32PCB.
Check the connection
Connection of low-voltage power supply unit and main board (M32 PCB). Confirm whether the cord is normally connected from a low-voltage power supply to the POW connector of main board (M32 PCB)
Check whether incompletely connection and oblique insertion of connector exist.
Try to plug in the code normally.
Connection cable between low-voltage power supply unit and main board (M32 PCB). Confirm whether it is disconnected.
Confirm whether the coating peeling off exists.
Check whether Cord ASSY defect exists such as the wire pulled out.
Replace it with normal low-voltage power supply unit.
Connection of main board (M32 PCB) and scanner unit. Confirm whether cable is normally connected with the SCNIF1 connector of main board (M32 PCB).
Confirm whether cable is normally connected with the drawer connector.
Check whether incompletely connection and oblique insertion of connector exist.
Try to insert the cord normally.
Connection cable between main board (M32 PCB) and scanner unit. Disconnection check by the tester. Confirm the coating peeling off by visual inspection. Replace it with normal cable.
Peripheral check of power supply
AC power supply supplied to the printer. Confirm the supplied voltage of the AC power supply. Supply the AC power supply.
Voltage setting of lowvoltage supply unit (110V/ 230V). Measurement of supplied AC voltage.
Confirm the power supply setting of the equipment used. (Confirm the short plug of the low-voltage supply setting switch. Short plug Have/None=100V /230V)
Adjust the lowvoltage power supply setting.
The 5V power supply supplied to the main board (M32 PCB). Confirm the 5V power supply by 7, 8, 9, 10pin of POW connector of the PU board (M32 PCB). Exchange the Lowvoltage power supply.
The 30V power supply supplied to the scanner unit. Confirm the 30V power supply by 1 and 3 pin of SCNIF1 connector of main board (M32 PCB). Exchange M32PCB.
Short circuit confirmation of power supply
The 5V power supply and 24V power supply and 30V power supply supplied to the main board (M32 PCB) Confirm whether short circuit exists by the POW connector of the main board. If
1, 2 pin : OVP
3 pin : OVU
4 pin : +30V
5, 6 pin : +24V
7, 8, 9, 10 pin:+5V
11~15 pin :OVL are measured, the position of short circuit can be located.
Pulling out the cords connected with the main board (M32 PCB) one by one, and then fix the position of short-circuit.
Exchange the short parts.
Error Code
Service Mode, Troubleshooting
Parts Catalog
Compatibility
Downloads Files
Home
New Register Forgot Password?
Send message to us